360 Newsletter Blog image

Innovating the Future: NREL’s New State-of-the-Art Control Facility at the Flatirons Campus

The National Renewable Energy Laboratory (NREL) is a leading research facility on clean energy and alternative fuel sources. This year, the Flatirons Campus and Wind Facility are completing their first ground-up building construction in several years, led by the HDR team. The new state-of-the-art building will act as the central control facility for all research efforts on the Flatirons Campus.

Modernized building construction requires a modernized mechanical and plumbing system to complement the building design. During the early phases of design, five (5) different mechanical systems were considered, with a wide range of factors including ease of maintenance, energy efficiency, and utilization of heating and cooling utilities. Ultimately, after energy modeling, lead time considerations, and cost considerations, NREL opted to proceed with the first Variable Refrigerant Flow (VRF) mechanical system on their Flatirons Campus.

The VRF system includes a packaged heat pump Dedicated Outdoor Air Unit (DOAS) with a heat recovery wheel for low-energy preconditioning of the building. The DOAS provides ventilation air to each indoor fan coil unit, easily complying with code requirements for the varied room types within the building. The building hosts conference spaces, electronics labs, a data center, and general office space.

The control facility was optimized to maximize floor space, presenting the unique challenges of configuring mechanical and plumbing systems in the limited plenum space. The team utilized REVIT during design to model systems beyond the 2D of CAD and capture any constructability conflicts early on.

The building is nearing the end of construction and the final stages of mechanical commissioning, with an occupancy slated for April. The unique mechanical and plumbing integration of exposed versus concealed aspects balances with the architectural aesthetics to create a truly beautiful building that is both pretty to look at and functions as a high-tech research facility. It’s great when these two design objectives find a way to cooperate!

Related News

A construction worker wearing a hard hat and safety vest takes notes beside a round metal ventilation unit on a rooftop, with city buildings and a crane visible in the background.

Protecting Your Mechanical Assets: Life-Cycle Planning and Predictive Maintenance

We all know that construction costs have risen over the years, and the capital needed to build or replace mechanical equipment is not a decision to be taken lightly. Understanding

Rows of maroon chairs and black tables arranged in a well-lit classroom with white walls, orange pillars, and two wall-mounted flat screen monitors.

Summer School Construction Starts Long Before Summer

Summer K-12 projects move at a pace that’s hard to appreciate until you have lived through one. For these construction projects, summer may be when the work is most visible,

Empty courtroom with wooden furnishings, judge’s bench, two tables with chairs, jury box, and spectator seating, under several ceiling lights.

Engineering Justice: The Hidden Role of Mechanical and Plumbing Systems in Secure Facilities

Justice facilities, like courthouses, detention centers, and police stations, are very different from typical buildings. They must operate 24/7 while balancing safety, security, and humane conditions for everyone inside. Behind