360 Newsletter Blog image

Protecting Your Mechanical Assets: Life-Cycle Planning and Predictive Maintenance

We all know that construction costs have risen over the years, and the capital needed to build or replace mechanical equipment is not a decision to be taken lightly. Understanding the Life Cycle Cost of a building’s mechanical system is an important component to assist in making decisions that will impact the facility budget for the next 20 years.

Reviewing multiple mechanical solutions with a life-cycle cost analysis (LCCA) lays the foundation for smarter budgeting and better long-term value. This allows facility owners to understand the upfront construction cost as well as the operational costs for each system and make more informed decisions in the early stages of the project. Operational costs include not only energy costs but also maintenance costs. Maintenance costs include the routine maintenance activities recommended by the manufacturer, including filter changes, grease/oil for moving parts, etc., to maintain your warranty. Other maintenance activities include routine updates to Temperature Control software and training facility staff on operations. 

Large industrial HVAC unit installed on a flat rooftop, surrounded by metal barriers under a partly cloudy sky.
Two men wearing safety vests examine an open electrical panel; one holds a laptop and both look at the panel, standing in an industrial setting.

So what, basic stuff right? Well, let’s take that one step further and consider asset protection and Predictive Maintenance (PdM). Predictive Maintenance is a data-driven approach to improve efficiency and extend the life of the equipment by predicting failures based on data. With the correct data collection devices installed and set up for trending, building management software systems can predict when equipment is not performing and detect early deterioration/failure.  

Why does this matter? If early deterioration can be predicted before full failure, then maintenance/replacement costs will be lower, energy efficiency can be optimized, downtime can be minimized, and you will be able to plan your next outage instead of dealing with an emergency on the weekend. 

During the design phase, discuss with the engineer what data needs to be captured, which points should be trended/stored, and how to use this information. If your facility is already built, it’s never too late to start PdM for asset protection.  Measuring and data collection devices can be installed post construction along with modifications to programming to capture the information in an impactful manner. 

360 Engineering would love to work with you on your next project, or provide a detailed assessment of your current facility and operations to help plan improvements for optimization and long-term asset protection. Contact us to get started.

Related News

Rows of maroon chairs and black tables arranged in a well-lit classroom with white walls, orange pillars, and two wall-mounted flat screen monitors.

Summer School Construction Starts Long Before Summer

Summer K-12 projects move at a pace that’s hard to appreciate until you have lived through one. For these construction projects, summer may be when the work is most visible,

Empty courtroom with wooden furnishings, judge’s bench, two tables with chairs, jury box, and spectator seating, under several ceiling lights.

Engineering Justice: The Hidden Role of Mechanical and Plumbing Systems in Secure Facilities

Justice facilities, like courthouses, detention centers, and police stations, are very different from typical buildings. They must operate 24/7 while balancing safety, security, and humane conditions for everyone inside. Behind

Children sit at black tables in a modern classroom with blue accents, a whiteboard, and acoustical ceiling panels; an adult stands at the front of the room.

360 Engineering at ASHRAE: Top Takeaways for Owners and Architects

At this year’s Rocky Mountain Chapter ASHRAE Technical Conference, one message came through clearly: the future of building environments is being reshaped faster than ever. Centered around the theme “Healthy